Skip to content
Snippets Groups Projects

ci: bump test timeouts

Merged Pekka Paalanen requested to merge pq/weston:mr/timeouts into main

This is prompted by the spurious CI failure https://gitlab.freedesktop.org/wayland/weston/-/jobs/13891809 saying:

31/36 output-damage                          TIMEOUT        122.52s   8 subtests passed
32/36 output-transforms                      TIMEOUT        122.52s   16 subtests passed
33/36 subsurface                             TIMEOUT        122.52s
34/36 xwayland                               TIMEOUT        122.51s
35/36 ivi-shell-app                          TIMEOUT        122.51s
ERROR: Job failed: execution took longer than 5m0s seconds

That is hitting both kinds of timeouts at the same time: the per-test timeouts, and the CI job total timeout.

That run seems to have had a particularly ill fortune, as a simple retry finished the same job in 2 minutes, and the longest running test took only 24 seconds.

Nevertheless, by Daniel Stone's suggestion let's bump both timeouts:

  • the per-test timeout to 120 seconds, which with the multiplier in CI goes up to 8 minutes

  • the job timeout for all build related jobs to 15 minutes

The timeout for tests_standalone is not bumped as we are not adding significant amounts of new tests there.

Signed-off-by: Pekka Paalanen pekka.paalanen@collabora.com

Merge request reports

Loading
Loading

Activity

Filter activity
  • Approvals
  • Assignees & reviewers
  • Comments (from bots)
  • Comments (from users)
  • Commits & branches
  • Edits
  • Labels
  • Lock status
  • Mentions
  • Merge request status
  • Tracking
Please register or sign in to reply
Loading