-
In between the two phases introduced by the previous change. This makes sure all pending drawing to the new buffers is flushed before they're committed to the Wayland server. (cherry picked from commit a542224e)
0238359b
In between the two phases introduced by the previous change. This makes sure all pending drawing to the new buffers is flushed before they're committed to the Wayland server. (cherry picked from commit a542224e)