-
Chris Wilson authored
Convert from using constant loops of indeterminate loads over to using a duration based with precise dummyloads, we are able to do more cycles in less time by limiting the amount of BUSY_LOAD required to exercise the test. v2: Bump limits and make the checks tighter. Signed-off-by: Chris Wilson <chris@chris-wilson.co.uk> Reviewed-by: Joonas Lahtinen <joonas.lahtinen@linux.intel.com>
4340b479