1. 14 Aug, 2013 1 commit
    • Daniel Vetter's avatar
      tests: roll out igt_fixture · b3880d3a
      Daniel Vetter authored
      Also sprinkle igt_assert and igt_require over the setup code to clean
      up code while at it. To avoid gcc getting upset about unitialized
      variables just move them out of main as global data (where they always
      get initialized to 0) - gcc can't see through our igt_fixture and
      igt_subtest maze properly.
      Signed-off-by: Daniel Vetter's avatarDaniel Vetter <daniel.vetter@ffwll.ch>
      b3880d3a
  2. 13 Aug, 2013 1 commit
  3. 12 Aug, 2013 7 commits
  4. 10 Aug, 2013 1 commit
  5. 06 Aug, 2013 1 commit
  6. 18 Jul, 2013 1 commit
    • Damien Lespiau's avatar
      tests: Black list tests we don't want to run on simulation · 5fa15f79
      Damien Lespiau authored
      Let's start by a small set of tests, to eventually consider running
      more.
      
      The current list should then be:
      
      gem_mmap
      gem_pread_after_blit
      gem_ring_sync_loop
      gem_ctx_basic
      gem_pipe_control_store_loop
      gem_storedw_loop_render
      gem_storedw_loop_blt
      gem_storedw_loop_bsd
      gem_render_linear_blits
      gem_tiled_blits
      gem_cpu_reloc
      
      gem_exec_nop
      gem_mmap_gtt
      
      v2 add (Daniel Vetter)
      gem_exec_bad_domains
      gem_exec_faulting_reloc
      gem_flink
      gem_reg_read
      gem_reloc_overflow
      gem_tiling_max_stride
      prime_*
      Signed-off-by: default avatarDamien Lespiau <damien.lespiau@intel.com>
      5fa15f79
  7. 10 Jan, 2012 3 commits
  8. 29 Jan, 2011 2 commits