-
To allow completion for mesh connections channel and band need to be set. This is only done if both values are absent. It does not check existing values against a given ap_freq. This maybe changed to throw an error and detect a possible conflict. Any other check is left to verify step of connection. This change allows to use ap freq during complete. For tests 0 is passed as frequency for now. This needs to be changed if completion of freq should be tested. [lkundrak@v3.sk, thaller@redhat.com: formatting fixes]
77b13c68